Task Order 04
Planning & Architecture
- Design and Construction of a POE on the Syrian border that consisted of 6 new buildings, totalling 5,000 sm under roof on 40 acres of land that was developed.
- One (1) Administration Building
- One (1) Combination Warehouse/Loading Dock/Detention Facility.
- 3 Entry Control Point Buildings and One (1) Public Toilet.
- Connected to National Power Grid and install 850Kva Generator.
- Water connected to City Water.
- Fuel Point with 25,000 liter Benzene Bulk Storage and 50,000 liters Diesel Bulk Storage.
07 Sep 06
Start date
30 Nov 07
Date completed
$24MM
Cost